Water damage due to flooding
Dear businesspartners, unfortunately we have been affected by flooding in the Augsburg area. As we need to clean and dry up our production plant together with all our staff, please understand that our contactability will be reduced for the next few days. All in- and outgoing deliveries will have to be post- poned for the time being. Our staff will contact you as soon as possible.
for ferric chloride for phosphate elimination
- with ladder and operation platform
- with filling cabinet attached to retention tank and double-walled filling pipe
- with dosing pumps and valves
- with integrated drip tray
- piping system with spring-loaded valve
- installation of media pipe in a protection tube
for a poly aluminium chloride blend
- with fully automatic siphon discharge pipe
- with container equipped with dosing station
for dosing of precipitation chemicals on a waste water treatment plant
- with dosing pumps and valves
- with integrated drip tray - with electric control unit
for ferric chloride for phosphate elimination
- with ladder and platform on tank
- with dosing unit (cabinet installation
30 m³ for Ferric cloride on a waste water treatment plant
for ferric chloride for phosphate elimination
- with ladder and operation platform
- with filling cabinet attached to retention tank and double-walled filling pipe
- with dosing pumps and valves
- with integrated drip tray
- piping system with spring-loaded valve
- installation of media pipe in a protection tube
for a poly aluminium chloride blend
- with fully automatic siphon discharge pipe
- with container equipped with dosing station
for dosing of precipitation chemicals on a waste water treatment plant
- with dosing pumps and valves
- with integrated drip tray - with electric control unit
for ferric chloride for phosphate elimination
- with ladder and platform on tank
- with dosing unit (cabinet installation
30 m³ for Ferric cloride on a waste water treatment plant