Dear customers and business partners,
in order to reduce processing time for quotations and confirmations we will be introducing a new ERP system from 21st until 25th June. As there will be training session on the new system as well as some system shutdowns we might not be able to respond to your inquiries as quickly as usual during this period.
Thank you in advance for your kind understanding!
Home / Our Services / Applications / Clarification plants
for ferric chloride for phosphate elimination
- with ladder and operation platform
- with filling cabinet attached to retention tank and double-walled filling pipe
for a poly aluminium chloride blend
- with fully automatic siphon discharge pipe
- with container equipped with dosing station
for precipitation chemicals on a purification plant
- with filling pipe attached to retention tank
- with dosing station in protection container
for dosing of precipitation chemicals on a waste water treatment plant
- with dosing pumps and valves
- with integrated drip tray
- with electric control unit
- with dosing pumps and valves
- with integrated drip tray
- piping system with spring-loaded valve
- installation of media pipe in a protection tube
for ferric chloride for phosphate elimination
- with ladder and platform on tank
- with dosing unit (cabinet installation
30 m³ for Ferric cloride on a waste water treatment plant